RESITAR 30 A
Three component, solvent-free, pourable epoxy mortar, combined with coal tar and recommended for bedding preformed road joint slots.
U.M. | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Compression strength (after 1 day) | 25 | N/mm2 | ||||||||||||
Compression strength (after 7 days) | 50 | N/mm2 | ||||||||||||
Modulo elastico a compressione (UNI EN 13412) | 4400 | N/mm2 | ||||||||||||
Resistenza a flessione (UNI EN 196-1) | 28 | N/mm2 | ||||||||||||
Shore A hardness (only A+B) (*) | 92 | |||||||||||||
Shore D hardness (only A+B) (*) | 48 | |||||||||||||
Adhesion to dry concrete | Cohesive break of the substrate | |||||||||||||
Adhesion to wet concrete | 3 | N/mm2 | ||||||||||||
Density | 1,50 | Kg/dm3 | ||||||||||||
A + B + C mixture ratio | 100 + 200 + 386 |
(*) hardness values are supplied only for the binding part, A + B component, because the inert does not allow even data: full mixture A + B + C has hardness values higher than those shown in the table.
Preparation of the foundation
The surface to be treated must be clean, whole, dry and mortar grout and crumbly part-free: ideal adhesion is achieved by roughening it with sandblasting treatment followed by thorough suction.
Concrete must be fully cured (28 days).
Preparation of the product
Pour component B into component A and blend at slow speed for 3’ – 5’ using drill with helix/spiral; during this operation, scrape also the bottom and the sides of the bucket, then slowly add component C (inert) and blend until an even and lump-free mixture is achieved.
Application
Cast RESITAR 30 mortar in the volume to be filled.
Note
Packages are weight pre-measured out: fully use all three components A, B and C.
If you wish to divide the package, products must be weighed by respecting the A+B+C ratio on the label and must not be weighed out based on the volume.
When mixing, the reaction between the two components starts: the time available is limited and it depends on temperature.
temperature | pot life | hardening | ||||||||||||
10 °C | 60 - 70' | 8 hours | ||||||||||||
20 °C | 35 - 45' | 5½ hours | ||||||||||||
30 °C | 20 - 35' | 3½ hours |
Complete hardening is achieved after 7 days.
To fill a volume of 1 dm3 with RESITAR 30 A mortar 1.5 kgs of product are necessary.
Available in 4.5 kg packages (A + B + C components).
RESITAR 30 A remains unaltered for a year if stored in a dry and sheltered place at a temperature between +10°C and +30°C in its original sealed containers.